Hint:
Performing the intelligent tester active test allows relay, vsv, actuator and other items to be operated without removing any parts. Performing the active test early in troubleshooting is one way to save time.
The data list can be displayed during the active test.

Diagnosis system
On-vehicle inspectionSystem description
Description
The eps (electronic power steering) system generates
torque through the operation of the motor and the
reduction gear installed on the column shaft in order to
assist steering effort.
The power steering ecu determines directions and the
amount of assisting power in accordanc ...
Front fog light circuit
Description
The main body ecu controls the front fog light relay (marking: fr fog) when a
signal is received from
the headlight dimmer switch.
Wiring diagram
Inspection procedure
Perform active test by intelligent tester
Connect the intelligent tester (with can vim) to the
dlc3 ...
Tilting up and down
Tilts the moon roof up*
Tilts the moon roof down*
*: Lightly press either end of the
moon roof switch to stop the moon
roof partway.
The moon roof can be operated when
Vehicles without a smart key system
The engine switch is in the “on” position.
Vehicles with a smart k ...