Installation
ComponentsEvaporative emission system switching valve control
Dtc summary
Hint:
The vent valve is built into the canister pump module.
Description
The description can be found in the evap (evaporative emission) system (see
page es-335).
Inspection procedure
Refer to the evap system (see page es-340).
Monitor description
5 Hours* after the ign ...
Stop light switch circuit
Description
While driving with the cruise control, if the ecm detects that the brake
pedal is depressed, the cruise
control operation will be canceled. The stop light switch sends brake pedal
status signals to the ecm.
When the brake pedal is not depressed, terminal st1- is equal to the ...
Starter relay
On-vehicle inspection
Disconnect cable from negative battery
terminal
Caution:
Wait at least 90 seconds after disconnecting the
cable from the negative (-) battery terminal to
prevent airbag and seat belt pretensioner activation.
Remove starter relay
Remove the starter relay fr ...