Instead, tap the part with a plastic-faced hammer.
Problem symptoms tableShift solenoid "d" control circuit
Description
Shifting from 1st to o/d is performed in combination with the on and off
operation of the shift solenoid
valves sl1 and sl2, which are controlled by the ecm. If an open or short circuit
occurs in any of the shift
solenoid valves, the ecm controls the remaining normal shift sol ...
Installation
Install front bumper side retainer lh
Install the clip and bumper side retainer.
Install the bolt.
Torque: 6.0 N*m (61 kgf*cm, 53 in.*Lbf)
Install front bumper side retainer rh
Hint:
Use the same procedures described for the lh side.
Install front bumper reinforcemen ...
Fog light relay
On-vehicle inspection
Inspect front fog light relay
Remove the front fog relay from the no. 6 Relay
block.
Measure the resistance of the relay.
Standard resistance
If the result is not as specified, replace the relay. ...