Torque: 5.4 N*m (55 kgf*cm, 48 in.*Lbf)

Removal
2Az-fe ignitionInstallation
Install mass air flow meter
Install the mass air flow meter with the 2 screws.
Notice:
Make sure that the o-ring is not cracked or
jammed when installing it.
Connect the mass air flow meter connector.
Connect cable to battery negative terminal
...
Basic inspection
When measuring resistance of
electronic parts
Unless otherwise stated, all resistance
measurements should be made at an ambient
temperature of 20°c (68°f). Resistance
measurements may be inaccurate if measured
at high temperatures, i.E. Immediately after the
vehicle has been r ...
Components
...