Torque: 5.4 N*m (55 kgf*cm, 48 in.*Lbf)

Removal
2Az-fe ignitionDrl relay circuit
Description
The main body ecu controls the daytime running light no. 2 Relay (marking:
drl no.2).
Wiring diagram
Inspection procedure
Inspect daytime running light relay (marking: drl no. 2, Drl no. 3,
Drl no. 4)
Remove the no. 2 Relay, no. 3 Relay and no. 4 Relay from
th ...
Control module communication bus off
Description
Inspection procedure
The skid control ecu inputs the signals from the ecm, steering angle sensor,
and yaw rate and
acceleration sensor via can communication system.
Check harness and connector (momentary interruption)
Using the data list of the intelligent test ...
On-vehicle inspection
Check ignition coil assembly and perform spark test
Notice:
in this section, the terms "cold" and "hot" refer to
the temperature of the coils. "Cold" means
approximately -10 to 50°c (14 to 122°f). "Hot" means
approximately 50 to 100°c (122 to 212 ...